Table 1: List of Legal Measures Taken in
FY 2000
|
No. |
Name of Case |
Description |
Violated Article |
Date of
Recommendation, etc. (Date of Decision) |
|
1 |
Case against Himeji
Association of Plumbing, Heating, and Air-conditioning Constructors |
Dealt with the material
distributors on unjustly restrictive terms by prohibiting them from selling
the material directly to members as well as non-members when it purchased the
material which the water supply bureau of Himeji City designated as proper
for water supply work. |
Article 19 (General
Designation Item 13) |
April 7, 2000 (May 10, 2000) |
|
2 |
Case
against K. K. Sagisaka |
Dealt with its
suppliers of bicycle goods with the proviso that the suppliers would not sell
the goods, directly or indirectly, to its client mass merchandisers except
through its agency. It also had its client wholesale dealers refuse to sell
popular character bicycle goods produced by Oaks to its specific competitors. |
Article 19 (General
Designation Items 2 and 13) |
April 27, 2000 (May 16, 2000) |
|
3 |
Case Against Takahata
Kensetsu K. K. and 202 others |
Colluded to prearrange
the winner of limited bids invited by Kamikawa sub-prefectural office of
Hokkaido Prefectural Government for agricultural engineering works for
farmland development projects. |
Article 3, the latter
phrase |
May 15, 2000 (June 16, 2000) |
|
4 |
Case against Yamazaki
Consultant Co., Ltd. |
Colluded to prearrange
the winner of limited bidding invited by the Kamikawa sub-prefectural office
of the Hokkaido Prefectural Government for land surveying and design projects
associated with agricultural engineering works for farmland development
projects. |
Article 3, the latter
phrase |
May 15, 2000 (June 16, 2000) |
|
5 |
Case against Yamaguchi
Mitsubishi Fuso Motor Sales Co., Ltd. and 3 others |
Colluded to fix sales
quotas of medium-duty trucks according to a predetermined share. |
Article 3, the latter
phrase |
June 27, 2000 (July 17, 2000) |
|
6 |
Case
against Pietro Co., Ltd. |
Supplied liquid salad
dressings and dressing-type sauces to retailers under the stipulation that the
retailers keep the recommended retail prices |
Article 19 (General
Designation Item 12) |
July 27, 2000 (August 9, 2000) |
|
7 |
Case against Daitoh
Trading Co., Ltd. |
Conspired to
prearrange the winner of the open bidding on fuel oil for vessels of the
Fisheries Agency |
Article 3, the latter
phrase |
October 5, 2000 (October 27, 2000) |
|
8 |
Case against K. K.
Uemura Kaihatsu and 16 others, in addition to Wakita Co., Ltd. |
Uemura Kaihatsu and 16
others conspired to refuse to rent and sell machines specifically designed
for the Rockman Method to non-members of the Construction Section of the
Rockman Method Association. Wakita refused to rent
and sell such machines to the non-members unless they obtain membership of
the Section. |
Article 19 (General
Designation Items 1 and 2) |
October 6, 2000 (October 31, 2000) |
|
9 |
Case against Kumamoto
Hino Motors, Ltd. and 3 others |
colluded to sell
medium-duty trucks at price based on a calculation method common among the
firms involved, as well as to fix the sales quota of each according to the
predetermined share |
Article 3, the latter
phrase |
October 31, 2000 (December 6, 2000) |
|
No. |
Name of Case |
Description |
Violated Article |
Date of
Recommendation, etc. (Date of Decision) |
|
10 |
Case against FDK
Corporation and 3 others |
Colluded
to prearrange the winner of the open or limited bidding invited by the Ground
Self Defense Force for 5 items making up nearly 100% of the dry batteries
purchased for communication equipment. |
Article 3, the latter
phrase |
December 4, 2000 (December 22, 2000) |
|
11 |
Case against Alpine
Electronics, Inc. |
Traded
with the retailers of its products, directly or through local dealers, under
the stipulation that the retailers should not make the sticker price of its
car audio and car navigation systems as well as the peripheral products lower
than the standard retail price. |
Article 19 (General
Designation Item 12) |
December 19, 2000 (January 23, 2000) |
|
12 |
Case
against Asami Corporation and 68 others |
Colluded
to prearrange the winners of the limited bidding or estimate consultation
invited by Machida City for a series of civil engineering projects. |
Article 3, the latter
phrase |
December 21, 2000 (February 9, 2001) |
|
13 |
Case
against Takao Kensetsu K. K. and 53 others |
Colluded
to prearrange the winners of the limited bidding or estimate consultation
invited by Machida City for a series of construction projects. |
Article 3, the latter
phrase |
December 21, 2000 (February 9, 2001) |
|
14 |
Case
against Ato Const K. K. and 45 others |
Colluded
to prearrange the winners of the limited bidding or estimate consultation
invited by Machida City for a series of paving works. |
Article 3, the latter
phrase |
December 21, 2000 (February 9, 2001) |
|
15 |
Case
against Nara Ready-mixed Concrete Co-op |
Unreasonably
prevented the manufacturers or dealers of cement from dealing with the
competing ready-mixed concrete manufacturers. |
Article 19 (General
Designation Item 15) |
January 31, 2001 (February 20, 2001) |
|
16 |
Case
against Ichiko Kogyo K. K. and 16 others |
Colluded
to prearrange the winner of the limited bidding invited by Toyama Prefectural
Government for waterproofing and anticorrosion treatment works |
Article 3, the latter
phrase |
February 8, 2001 (March 6, 2001) |
|
17 |
Case against Kitagawa
Rekisei Kogyo K. K. and 15 others |
Colluded
to prearrange the winner of the limited bidding invited by Toyama Prefectural
Government for waterproofing and anticorrosion treatment works |
Article 3, the latter
phrase |
February 8, 2001 (March 6, 2001) |
|
18 |
Harui
Kogyo K. K. and 28 others |
Colluded
to prearrange the winner of limited bidding or estimate consultation invited
by Hiroshima City for water main works. |
(Article 3, the latter
phrase) |
February 28, 2001 (March 30, 2001) |
(Note) The violated article of the case
No. 18 is parenthesized because the case is still under hearing procedure.